Monday, June 28, 2010

cable

Wednesday, April 28, 2010


Tuesday, April 27, 2010

cable

CABLE DIAGNOSTIC UNIT:

PD MAPPING
function: scanning and tracing medium voltage(33 and 11 kv) underground cable

tester: Partial Discharge mapping (PD mapping)

IR TESTING IR = insulation resistive

Bold

Thursday, April 22, 2010

genting sunyen dengkil





power solvent 20

this liquid was used to removed dirt(carbon) at circuit breaker compartment and busbar contact and surface.





120 ohm thermostat


33kv main busbar



potetial transformer fuse

rating: 36 kv, 3.15A , model: ABGNA 7/92





connection of potential transformer





PT fuse holder



PT fuse holder contact

this part was connected between PT fuse and cable busbar



current tranformer (CT)

CT function is to step down current charge in cable busbar to set current.



Potential Transforment (PT) compartment

Wednesday, April 21, 2010

ULTRA TEV

this handy device have 2 function:
1.ultra sound
2.TEV( transient earth voltage)






ultrasound inspection made for checking circuit breakers compartment condition.
ultrasound checking more to surface inspection.

type of sound produced when a compartment had a problem :
1.corona
2.arking
3.tracking

reading:

0 - -ve dB : ok
1 - +ve dB : not ok



TEV inspection is more to secondary part (relay, thermometer)

TEV reading:

1 - 6 v : internal dischage
7 - 29 v : surface discharge
30v and above : floating metal


primary part: busbar, cable, poteintial transformer and current tranformer

following substation unit





Tuesday, April 20, 2010

VISIT PPU MUTIARA RINI DAMANSARA

type of breaker:
11 kv : AIS (air insulated switchgear)
33kv : GIS (gas insulated switchgear)

JOB:
servicing breakers:
1. cleaning breaker's surface with cotton.
2. spray breaker gear with WD40
3. testing breaker with manually tripping.

11kv breakers serviced done by TNB
33kv breakers serviced done by manufacturer ABB